Read a bill of quantities alongside its drawings, specification and quotation notes. Check that each tenderer has priced the same scope, then identify omissions, allowances and responsibilities before comparing the totals. A detailed BOQ helps structure that comparison; its usefulness depends on how current and coordinated the underlying information is.
Start with the document issue
Record the date and revision of the BOQ, drawings and specification issued for pricing. If the kitchen layout or counter changes after that issue, ask how the change has been carried into the quantities and contractor responses. Keep one tender clarification list that all relevant tenderers receive. A consistent measurement and description method helps comparison; RICS NRM provides measurement guidance, including NRM 2 for detailed building works.
- List the documents that form the priced scope.
- Identify superseded drawings.
- Record changes as dated clarifications.
Read the description as well as the quantity
A quantity without an adequate description leaves important differences unresolved. Check the unit, material, finish, location and included work. A wall item may need to identify its construction and finish; a joinery item may need dimensions, hardware and installation details. Ask whether associated preparation, protection and making good are included. The aim is to understand what the tenderer has allowed for rather than assume that a short item title includes everything.
- Match item references to the drawings.
- Check units and quantity assumptions.
- Ask for unclear inclusions to be stated in writing.
Check the kitchen and equipment interfaces
Make an equipment schedule part of the review. For each item, identify who supplies it, who places it, who connects it and who checks it is ready for use. Coordinate the equipment supplier's current connection requirements with the electrical, plumbing, drainage and ventilation scope. A change in the equipment model can affect these interfaces. The design and competent technical teams should confirm the required installation and testing for the actual venue.
- Separate equipment supply from installation and connections.
- Confirm the latest equipment model and data.
- Include access for maintenance in the review.
Make allowances and exclusions visible
Read provisional amounts and unmeasured items carefully. Ask what each allowance covers, what information remains outstanding and how the final amount will be agreed. Review exclusions against the full project needs: an excluded item still needs an owner and a budget if it is required. Do the same for approvals, inspections, utility arrangements and landlord requirements; responsibility should be confirmed for the project rather than inferred from a contractor's general statement.
- Create an inclusion/exclusion comparison for every tenderer.
- Assign unresolved items to a named project role.
- Keep contingency separate from agreed work.
Compare the programme and handover scope
Include site access, working hours, material approvals and the handover sequence in the review. A low total may be difficult to compare if one offer omits the installation conditions, testing or close-out information needed by the venue. Ask for key dependencies, lead-time assumptions and outstanding selections. Before award, consolidate the agreed scope, drawing revisions, clarifications and exclusions so the instruction to proceed is clear.
- Confirm what is required at practical handover.
- Identify who supplies operating and care information.
- Track later changes against the agreed baseline.
ARMA's relevant design-stage experience
For Bosavia Coffee, ARMA's documented delivery covered the café design, kitchen layout and a BOQ prepared for tendering the construction works. That record is a design-stage example. When discussing a new restaurant or café, bring the latest layout, equipment list, site information and intended opening programme so the work to be priced can be defined. This guide is a procurement planning aid; it does not determine the contractual meaning of a particular tender.
Sources and scope
This guide supports initial planning. Venue, equipment and material-specific requirements are checked during the survey.